Draft, subject to change. These terms are still being finalised and may change before they apply to any order. Items in [square brackets] are still to be confirmed. Your quote will say which version of the terms applies.
These terms apply to every order you place with OnTrack O&M Ltd, a company registered in England and Wales under number 17504329, whose registered office is at 47 Haydons Road, London SW19 1HG (we, us, our).
You means the business named on the quote. These terms are for business customers only.
A contract is formed when you accept our written quote and we receive your purchase order (PO) or other written order, or, where the quote says work starts on acceptance, when you accept it. The quote, the Letter of Authority and these terms together form the contract (the Order). If they conflict, the quote takes priority, then these terms.
Definitions: Project means the project named in the quote. Supply Chain means the subcontractors, suppliers, manufacturers and consultants named in the subcontractor and supplier list you give us. Manual means the operation and maintenance (O&M) manual and electronic folder we produce. Project Information means documents and data you or the Supply Chain provide for the Project. Band means the published price band for the number of companies supplying documents, as set out in the quote. Document Register means the list of documents required for the Manual that we confirm after your upload. PC means practical completion of the Project, or of the phase the Manual covers. Essential Manual and PC Pack have the meaning in clause 5.3. Add-ons means the deliverables in clause 2.8. Aftercare means the subscription services described in Schedule 1. Owner means the building owner, or whoever runs the building for them, that you name to us or that signs up for Aftercare through the link we give you.
We check, organise and present Project Information and produce the Manual described in the quote. Chasing is included for every company in the Supply Chain: once we have checked what you upload, we request and collect any Project Information still outstanding from the company that owes it. We do not contact a company whose Project Information you have already uploaded in full. If nothing needs chasing, we may instead give you an upload link for anything still to come, at the same price.
We check that documents are relevant, legible and appear to match the assets listed in the required information register. We do not check that the installation is designed, installed, tested or commissioned correctly.
We do not design, inspect, test, commission, certify or approve any work, and nothing in the Manual is a certificate or warranty by us. Certificates, test results and commissioning records in the Manual are reproduced as supplied by the party that issued them.
Where a company has not supplied a manufacturer's manual or datasheet after two chases, we may obtain the manufacturer's published literature for the model we have been told is installed, from the manufacturer's own website or official document library only. We ask the company that owes it to confirm it is the model installed before it goes in the Manual. Your project manager may choose to use it without that confirmation, in which case the Manual records it as not confirmed by the installer. We label it with its source and check it in the same way as any other document. You should ask the installer to confirm the model where this matters.
We use software and artificial intelligence (AI) tools to read, sort, draft and chase. Our engineer, S. Fellerman, reviews the register at the start and checks and signs off every Manual before it is issued to you. Text drafted by AI is marked for that sign off and is never issued without it.
We do not accept the following into the Manual, and return them to the sender with a request to resubmit: (a) drawings whose title block status is not As-built or Record (for example preliminary, tender or for construction); (b) manufacturers' literature that does not identify the model actually installed (for example a range brochure with the installed model not marked); (c) certificates, test records and training records that are not signed and dated. Anything still not resubmitted by final issue is listed in the outstanding information schedule under clause 4.3.
Where the quote says so, we produce separate mechanical and electrical Manuals with a shared introduction, priced as set out in the quote.
Where the quote includes them, we also produce these Add-ons from the Project Information and the Manual, at the prices in the quote: (a) a COBie (Construction Operations Building information exchange) workbook; (b) a building log book in the style of CIBSE TM31 (Chartered Institution of Building Services Engineers Technical Memorandum 31), to support the information duty in regulation 40 of the Building Regulations 2010; (c) the building services information for the health and safety file under the Construction (Design and Management) Regulations 2015 (CDM); (d) a building user guide, included where the Project is assessed under BREEAM (Building Research Establishment Environmental Assessment Method) and otherwise on request; (e) fire safety information for the responsible person under regulation 38 of the Building Regulations 2010, included where the work is a new build, an extension or a change of use, and otherwise on request; (f) an asset import file in CSV (comma separated values) format mapped to the column headings your CAFM (computer aided facilities management) system commonly uses; and (g) extended warranty registration tracking: we identify the plant in the asset register that commonly needs registering with its manufacturer to receive the full or extended warranty, chase the installer for each registration confirmation, warn your project manager before each date we have worked out and when it passes, and include a registration register with the Manual. The CAFM import file and the PC Pack are included in the price at no extra cost.
Add-ons contain only information found in the Project Information. Fields we cannot fill from it are left blank and are never estimated. The log book follows the published structure of CIBSE TM31 in our own words. The CAFM file uses a generic column mapping and is not a template supplied or approved by the CAFM provider. Under CDM the principal designer remains responsible for preparing, reviewing and handing over the health and safety file; we provide the building services information for it. Where the quote includes a building user guide, the building owner remains responsible for meeting any BREEAM credit. The building user guide is written from the Project Information: we do not visit the site, and the BREEAM assessor decides whether it meets the credit. The fire safety information is compiled from the Project Information: we do not write or check the fire strategy, assess fire risk or act as the responsible person, and the duty under regulation 38 to give the information to the responsible person stays with the person carrying out the building work. Information held by others, such as the fire strategy and fire safety plans, is listed as held by others unless the company holding it is on your subcontractor and supplier list. For extended warranty registration tracking, we do not register any product ourselves or on anyone's behalf: registration is made by the installer or the building owner as the manufacturer's terms require. Register by dates use the manufacturer's stated period where a document we receive gives one, and otherwise an assumed period from practical completion shown in the register; the manufacturer's terms prevail. We are not liable for any warranty lost because a product was not registered, or not registered in time.
Schedule 1 sets out the Aftercare services, including Ask This Building, the online repository, maintenance reminders, the seasonal commissioning tracker and the living manual.
Plant QR stickers. Every Manual includes one printed QR sticker for each item in the asset register, on hard-wearing polyester, carrying its reference. You can ask for them from your project page at any time once the first draft Manual is built (for example to fit with the plant labels before handover), or the Owner can ask for them from the building's page. Each sticker links to that item online. You, or the installer, fit them; we do not attend site. Extra or replacement sets are free on reasonable request.
You will give us: a subcontractor and supplier list with contact details, the O&M requirements (usually a specification clause or employer's requirements), relevant schedules and drawings, and your branding files.
You will sign the Letter of Authority so we can contact the Supply Chain on your behalf, and ask your project manager to send the introduction email we draft. Anything still missing is listed in a weekly report to you.
You will respond within a reasonable time to our questions and to items we escalate to you. Obtaining information from a party that does not respond to us is ultimately your responsibility under your contract with them.
You confirm that you are entitled to share the Project Information and the Supply Chain contact details with us for this purpose.
You will check the draft Manual and send any comments within the period stated in the quote. In your client area you can also replace or add to our written system descriptions with your own words; you are responsible for the accuracy of words you add, and the documents received from the Supply Chain are never changed.
If you can, you will tell us who will run the building after handover (name, email address and company), and you confirm you are entitled to give us those details so we can contact them about the Manual and Aftercare. If you do not, we give you a link to pass on to them.
For each company that owes Project Information, we chase on the schedule described in the quote. Unless it says otherwise, we send a request on day 0, a reminder on day 5 and a firm reminder on day 10 copied to your project manager (counting working days from the request), then up to 2 weekly chases, still copied to your project manager. We then pause chasing that company until your project manager decides under clause 4.5 whether to accept what it has sent or have us keep chasing. If they ask us to keep chasing, we send up to 2 more weekly chases and then pause again.
We cannot compel anyone to provide information and are not responsible for delay or failure by the Supply Chain.
Any information not received by final issue is listed in the Manual's outstanding information schedule, with the party responsible. We continue to chase and reissue the Manual for [8] weeks after final issue at no extra cost, unless the quote says otherwise, and we include anything you upload in that period.
If a company whose Project Information you uploaded turns out to owe more, we chase it at no extra cost. Chasing never changes the price.
Accepting a submission as sufficient. Your project manager, or anyone you allow to manage the job in your client area, can accept a company's submission as sufficient, in full or item by item. We then stop chasing those items, and the Manual records each one as not provided (or used as sent) and accepted by you, with the name of the person who accepted it, the date and the reason. If an accepted item is a statutory record (for example a gas safety record or a fire alarm certificate), you accept that the information is missing or incomplete and the legal duties it supports remain yours. We only record a decision for you if your project manager asks us to by email.
We act on redirections and stop requests from the Supply Chain: we switch to the contact they name and tell you, and stop emailing anyone who asks us to. Your project manager can nominate a replacement contact.
Dates in the quote are estimates. They depend on receiving information from you and the Supply Chain on time.
If you need the Manual sooner, we may offer a rush service at the price stated in the quote.
PC Pack. Unless the quote says otherwise, we issue an Essential Manual by the essential manual date in the quote (if none is given, 5 working days before PC). It contains section 1 (project information), section 4 (asset register), section 5 (planned maintenance), section 6 (emergency and isolation) and the certificates received by then, and is marked "Essential manual, full manual to follow within 4 weeks". The Essential Manual and the full Manual that follows it are the PC Pack.
We issue the full Manual within 4 weeks of PC. Anything not received by then is listed in the outstanding information schedule and dealt with under clause 4.3, so a late document from the Supply Chain does not hold up the rest of the Manual. If we have not received PC from you, or you instruct us after PC, the 4 weeks run from the date we receive your instruction and PO.
The price is the fixed price for the Band in the quote, set by the number of companies supplying documents, and includes chasing every company in the Supply Chain, one Manual and its set of plant QR stickers (clause 2.11). Add-ons and a printed manual, if you choose them, are priced in the quote. Discounts and surcharges (for example early booking, rush service or an offer on our offers page) are shown in the quote. Prices exclude VAT, which is added at the applicable rate [once we are VAT registered].
The price locks when we confirm the Document Register, within 2 working days of receiving your upload. If the confirmed Document Register, or a company supplying documents added later, moves the job into a bigger Band, we tell you and only change the price once you agree, in your client area or in writing. The difference is added to our invoice under clause 6.4.
The published Bands cover jobs with up to 25 companies supplying documents and up to 250 documents in the confirmed Document Register. Larger jobs, phased or multi-building handovers and higher-risk buildings under the Building Safety Act 2022 are priced by an individual Project quote. If a job booked in a published Band goes over 25 companies or 250 documents, we will tell you and give you a revised quote before carrying on, and the same lock applies to the revised quote.
There is no deposit. We start work once we have your PO. We issue one invoice for the price when we deliver the final Manual, quoting your PO number. Anything agreed after you accept the quote, including a bigger Band or an Add-on, goes on that invoice, so there are no separate small invoices. If the invoice has already been issued and is unpaid, we cancel it and issue a replacement; only if it has already been paid do we issue a single final adjustment invoice. We issue drafts and the Essential Manual watermarked, and release the unwatermarked final Manual with the invoice.
Invoices are payable within 30 days of the invoice date. We may charge interest and compensation on late payments under the Late Payment of Commercial Debts (Interest) Act 1998. [If an invoice is more than 14 days overdue, we may suspend online access to the Manual (the online repository and Ask This Building) until it is paid.] Your right to use the Manual under clause 7.1 starts once it is paid in full.
One round of comments on the draft is included. Further rounds, and work outside the quoted scope (for example a change of template after we have started), are charged at the rates in the quote or as agreed in writing before the work is done, and go on our invoice under clause 6.4.
Printed manual. If you choose a printed manual, it is priced on its number of pages (A4 colour, double sided, wire bound with a clear front and tabbed dividers, in volumes of up to 300 pages), at the price a set shown in the quote. It goes on our invoice under clause 6.4, and discounts in the quote do not apply to it unless the quote says so. Until all the documents are in, the price in the quote is an estimate, including an allowance for the pages still to come. Once the final Manual is complete we confirm the price on its final page count. If it is lower, we reduce our invoice. If it is higher, we tell you the new price and only charge it once you agree, in your client area or in writing; it goes on our invoice under clause 6.4. Drawings are included as QR codes that open the latest PDF of each drawing, and we keep those drawing links working for at least 10 years from handover. Further sets are priced the same a set and invoiced when you order them, payable before we print. A3 drawing sets are quoted on request. We send the printed manual to print once the final Manual is released, to the delivery address you give us.
Small job. Where the quote says "small job", the job has no more than the number of companies stated in the quote (5 unless it says otherwise), we do not chase the Supply Chain, and you upload all the Project Information through your own upload link. We check every document and compile the Manual to your company's standard format and file naming (the naming rule you gave on your first job, unless you give another), for the fixed price in the quote. Clauses 2.1 (chasing), 4.1 and 4.4 do not apply to a small job. If the job turns out to have more companies than that, or you want us to chase, we tell you first and agree the new price with you before going further; any difference goes on our invoice under clause 6.4.
Once you have paid in full, you and the building owner may use, copy and share the Manual and the Add-ons for the operation, maintenance, sale, letting and alteration of the building. This right continues after Aftercare ends.
Third-party material in the Manual (such as manufacturers' literature and certificates) remains owned by its authors and is included for O&M purposes only.
We keep ownership of our templates, software, processes, know-how and anything we created before or independently of the Order. Nothing in these terms transfers them to you.
We will not use your name or logo, or show any part of your Manual to anyone else, without your written permission.
Each of us will keep the other's confidential information confidential, and use it only for the Order, except where disclosure is required by law or the information is already public.
Where we process personal data (mainly Supply Chain contact names, email addresses and phone numbers, the Owner contact details you give us, the names and email addresses of the people given Aftercare access, and the names, email addresses and registration numbers on maintenance records sent to us) on your behalf, we do so as your processor under the Data Processing Terms, which form part of the Order.
We only use AI and cloud providers whose business terms do not permit them to use your data to train their models, and we list them in the Data Processing Terms.
AI is used to read and file documents, draft text for the engineer's sign off, chase, and answer Ask This Building questions. It is not used to make decisions about individuals.
Questions asked through Ask This Building are sent to our AI provider with the relevant pages of the Manual to produce the answer. We keep the questions asked for [ASK THIS BUILDING QUESTION LOG RETENTION PERIOD: TO BE CONFIRMED BY SAM BEFORE USE]. Our AI provider keeps what we send it for [AI PROVIDER RETENTION PERIOD: TO BE CONFIRMED BY SAM BEFORE USE] under its business terms, and does not use it to train its models.
The client portal, online repository and Ask This Building are hosted by Cloudflare in [HOSTING REGION: TO BE CONFIRMED BY SAM BEFORE USE].
Nothing in these terms limits liability for death or personal injury caused by negligence, for fraud, or for anything else that cannot be limited by law.
We are not liable for loss of profit, revenue, business or goodwill, or for any indirect or consequential loss.
We are not liable for the accuracy or completeness of information provided by you or the Supply Chain, or for the design, installation or performance of any works.
Our total liability under or in connection with an Order is limited to the price paid for that Order, including any Aftercare fees paid in the 12 months before the claim.
We hold professional indemnity insurance of at least [PI COVER FIGURE: TO BE CONFIRMED BY SAM BEFORE USE] for any one claim and will provide evidence on request.
Either of us may end an Order by written notice if the other materially breaches these terms and does not put it right within 14 days of being asked to.
You may cancel an Order at any time by written notice. You pay for work done up to the date of notice, which we invoice at that point.
Aftercare can be cancelled at any time as set out in Schedule 1. Cancelling Aftercare does not affect the Manual or your rights under clause 7.
These terms are the whole agreement between us about the Order. Changes must be agreed in writing (email is enough).
Neither of us is responsible for delay caused by events outside our reasonable control.
No one other than you and us has any right to enforce these terms under the Contracts (Rights of Third Parties) Act 1999.
These terms are governed by the law of England and Wales, and the courts of England and Wales have exclusive jurisdiction.
Aftercare is provided to the Owner and is never charged to you. When we issue the final Manual, we email the Owner contact you gave us (or you pass on the link we give you), and the Owner gets Aftercare free for 12 months from handover (or longer where an offer on our offers page says so). We remind the Owner before the free period ends. After that the Owner can carry on directly with us, with their own account in the client area, at our published price of £50 a month per building, or £400 a year paid in advance (a year costs 8 months). Aftercare is one option covering the online repository, Ask This Building, maintenance reminders and the living manual; single parts are available on request. If the Owner has not subscribed by the end of the free period, Ask This Building, maintenance reminders and the living manual stop, the online Manual stays available to view and download, and S1.5 applies if the online repository is later switched off. In this Schedule, you includes the Owner while it uses Aftercare.
| Option | What it includes | What it does not include |
|---|---|---|
| Online repository | Every document in the Manual and electronic folder, organised by manual section, searchable, with preview and download. A read only link to share with your maintenance team. Export everything and the offline handover pack, free to download while the repository runs and for 30 days after it stops (see S1.5). | Storage of documents unrelated to the building. Acting as your golden thread system of record (see S1.6). |
| Ask This Building (needs the online repository) | Plain English answers to questions about the building on any phone, drafted by AI from the Manual only, each with the page it came from. QR codes in the Manual open it. | Answers from outside the Manual, professional advice, or any use in an emergency (see S1.2). |
| Maintenance reminders | A monthly email of the planned maintenance, statutory checks and warranty expiries due, each with a Mark done link and a calendar you can export. Includes the seasonal commissioning tracker (see S1.3) and the maintenance log: a records address and Log a visit page for service sheets and certificates, which we read and add to the building's log, with a statutory checks tracker (see S1.8). | Carrying out, supervising, inspecting or certifying maintenance or commissioning, or confirming that the building complies with any law or standard. |
| Living manual | Send us details of replacement equipment or a new certificate and we check it, file it and reissue the Manual, up to 4 times a year. | Chasing third parties for new documents, or more than 4 reissues a year, unless the quote says so. |
| Price | All four parts above, £50 a month or £400 a year per building, after the free period. | As above. |
Ask This Building. Answers are drafted by AI from the Manual and can be incomplete or wrong. Every answer gives the page it came from and shows this notice: "AI drafted from your manual. Check the cited page before acting. Not for emergencies: call your maintenance contractor or 999." You must check the answer against the cited page before acting on it. Ask This Building is not monitored, is not for emergencies and is not a substitute for a competent person, a risk assessment, a permit to work or safe isolation procedures. In an emergency, follow the site emergency procedures and call your maintenance contractor or 999. Subject to clause 10.1, we are not liable for loss arising from acting on an answer without checking it against the cited page.
Seasonal commissioning tracker. Where the commissioning summary in the Manual lists seasonal commissioning or open commissioning items, the maintenance reminders remind you of them at 3, 6, 9 and 12 months after handover (and every 3 months after that with extended aftercare under S1.4), or at the dates in the commissioning plan. This is a reminder service only. We do not carry out, witness or certify commissioning, and responsibility for it stays with the party appointed to do it. Results you send us are filed, and with the living manual, added at the next reissue.
Extended aftercare (Soft Landings). To support a Soft Landings or Government Soft Landings (GSL) aftercare period, you can choose extended aftercare for 2 or 3 years from handover in your client area. It includes all four Aftercare options and the seasonal commissioning tracker every 3 months, at the Aftercare price of £50 a month (less any discount in the quote) for as long as it runs, paid as in S1.1. You can change or end it at any time, as with any Aftercare. Unless the quote says so, it does not include site visits, post occupancy evaluation or attending aftercare meetings.
Export, cancellation and deletion. While the online repository runs you can use Export everything at any time, free: the Manual as PDF, the electronic folder in manual section order, the Add-ons, the asset register as CSV, the maintenance tasks and history, and the activity log, in one zip. You can cancel Aftercare, or any option, at any time from your client area; it stops at the end of the free period or the period you have paid for. When Aftercare is cancelled or ends, or you switch the online repository off, the online repository stops and: (a) Ask This Building and share links stop; (b) Export everything and the offline handover pack stay free to download for 30 days; (c) we email you reminders on day 30 and day 80 after the repository stopped; (d) after day 30, Export everything and the offline handover pack close unless you switch the online repository back on; and (e) 90 days after the repository stopped, we permanently delete its files, the online Manual, the Ask This Building index, the offline handover packs and share links, except records we must keep by law [and one archive copy of each issued Manual kept for our professional indemnity records for [6] years, unless you ask us to delete it]. If you switch the online repository back on before day 90, it restarts with your files as they were.
Higher-risk buildings and the golden thread. On a higher-risk building under the Building Safety Act 2022, the accountable person and principal accountable person are responsible for keeping the golden thread of information. We are not the accountable person or the principal accountable person, and our online repository is not your golden thread system of record. You (and the building owner) must keep your own complete copy of the information we provide. We give you a golden thread export of the Manual, the electronic folder, the asset register and the change control log in open formats (PDF, CSV and folders) at handover and after each living manual reissue, for you to store in your own system. On a higher-risk building, your client area, the offline handover pack and our reminder emails carry a note that you keep your own golden thread copy, and the deletion in S1.5 applies to our copy only.
Availability. We aim to keep Aftercare available at all times but do not guarantee uninterrupted access. We may suspend it briefly for maintenance or security, and we will tell you of planned work where we reasonably can.
Maintenance log. The Manual stays as it was handed over. Service sheets, certificates and other maintenance records sent to the building's records address, through the Log a visit page or uploaded in the client area are filed with the building's documents and, while Aftercare is on, read using AI. Where a record clearly matches a task in the maintenance schedule and passes our checks (for example, that it is dated and signed and shows a registration number where the work needs one), we mark the task as done in the maintenance calendar; anything we are not sure about is checked by us before it is recorded. We also list what the records say needs doing and changes to the plant for you to decide on. The log and the statutory checks tracker show what the records sent to us say. We do not inspect the building, check that the work was done or done properly, or certify that the building or any system complies with any law or standard, and keeping the building maintained and compliant stays with you and your maintenance contractors. You confirm you are entitled to send us the records and the contact details on them. Records are kept with the online repository and S1.5 applies to them; include them in Export everything if you need to keep them for longer, for example for statutory record keeping periods.
Who can open the building's QR codes and links. The QR codes in the Manual, on the drawings and on the plant QR stickers, and the building's links, open the building's drawings, Manual and Ask This Building for anyone who has them, without signing in. Anyone who has the Manual can already read what they open. For a sensitive building (for example a prison, school or secure site), you or the Owner can switch them to signed-in people only on the Team and sharing page; the printed codes stay the same and then ask people to sign in. Links you create and send yourself keep working for whoever you send them to. Nobody can change the Manual through these codes and links; service records sent through Log a visit are checked before they go in the building's log (S1.8). Ask This Building has a fair use allowance: up to 50 questions a day and 100 a calendar month for people signed in to the building, and, separately, up to 10 questions a day for each person not signed in, within 30 a day and 100 a calendar month for the building. Questions answered before are not counted. We may change these allowances on reasonable notice and will tell the Owner if a building regularly reaches them.