Your O&M,
chased, written
and delivered.

Send us your project contact list. We chase every subcontractor and supplier, two independent AI checkers read every document, and an engineer signs off the manual in your branding.

Start a manual
Open a sample building
From £495every company chased, excl. VAT
15 minutesof your time to set up
Every pageengineer signed off
Follow a job

The job's finished. The paperwork isn't.

Practical completion is close, the main contractor wants the O&M, and half the certificates are still sitting in someone else's inbox.

Your site team should be closing out snags, not chasing datasheets. Meanwhile your retention waits.

Chasing it yourself
Every week
With OnTrack
15 mins

Your team's time on the O&M. Set-up is all we ask of you: we chase every subcontractor you need us to until handover.

1:04One minute: how OnTrack chases, checks and delivers your O&M manual.
1You send

Send us your subcontractor and supplier list.

Plus the O&M spec and your logo. From the spec and the asset list we work out every document needed, from every company.

0documents needed
0companies

Subcontractor and supplier list.xlsxFictional example

CompanyTradeDocs
Kelvair LtdAHU supplier24
Fluxon ClimateVRF installer21
Controlix ControlsBMS and controls18
Safeflow DampersFire dampers14
Linear DuctworkDuctwork11
Aquaboost PumpsBooster set12
Therma-PointWater heaters13
ProFlush Water HygieneWater hygiene9
Northwind M&E LtdInstaller20
2We request

Every company gets one clear list.

One email per company, not fifty. Each item has its own reference so replies land in the right place, and anyone can just reply with attachments.

Sent from our mailbox with your project manager's introduction, so suppliers know it's genuine.

3We chase

We chase, so you don't.

Reminders every 5 working days, only listing what's still missing. If someone goes quiet, you get one email with exactly what they owe, so you can use your contract.

Day 0 requestDay 5 reminderDay 10 firm reminder, your PM copiedThen your call: accept or keep chasing
Every company gets its own upload link. If someone says Dave's got the documents, we chase Dave.
4We check, twice

Every document is read by two independent checkers.

The moment a document arrives, Checker A reads it against the job: right project, right equipment, signed, dated, in date. Checker B reads it again from scratch, without seeing A's answer.

If they agree, it's filed into the manual. If they don't, it goes on the engineer's short list with both readings side by side.

Two checkers read every document against three hard rules. Anything that fails goes back to the sender with the reason.
5We build

Built in your branding.

Your logo, your colours, your font. A bookmarked manual and a tidy electronic folder, with a third check that every serial, model and date on the page matches the source document.

Asset registerPlanned maintenanceIsolationCertificatesWarrantiesSparesAs-built drawings

Try a client brand0 pages

Operation and maintenance manualElmwood Leisure CentreMechanical services
6Engineer signs off

A building services engineer signs it off.

A fourth check reads the whole manual for gaps: statutory items, isolation, warranties that depend on servicing. The engineer then reviews only what the checkers flagged, and signs.

4separate checks
100%of manuals signed off
0engineer minutes
High Fire damper drop tests FD-04 to FD-06 not received
High F-gas records for CU-02 outstanding
Check Checkers disagree on a booster set serial no.
Check Water heater warranty needs annual service
Check Microbiological results, one outlet retest
7You hand over

Your manual, on their phone.

Every manual comes with Ask This Building. The maintenance team ask a question on site and get an answer that points to the exact page, certificate or drawing. Free for the building owner for 12 months after handover, then part of aftercare at £400 a year.

Try it on the sample building

Ask This BuildingElmwood Leisure Centre
Where do I isolate booster set BS B.01?
Isolator on the booster set panel, then close the inlet and outlet isolating valves.Section 6, Emergency and isolation, Vol 1 page 154
And AHU R.02?
Rotary isolator at the AHU control panel, then the LTHW coil isolating valves.Section 6, Emergency and isolation, Vol 1 page 155
Included as standard

What's in every OnTrack manual

An O&M that doesn't hold up your retention. Everything the main contractor and the facilities team ask for at handover, built from one set of checked documents and signed off by an engineer.

PC pack

An essential manual by your essential manual date, before practical completion (PC): project information, asset register, maintenance, isolation and the certificates in so far. The full manual within 4 weeks of PC.

Checked twice, with hard rules

Two independent checkers read every document. Anything that fails goes straight back to the sender, saying exactly what to send instead.

  • Drawings marked as-built or record
  • Literature showing the model actually installed
  • Certificates signed and dated

CAFM-ready asset data

The asset register as a CSV file mapped to your client's CAFM (computer aided facilities management) system: Archibus, Planon, Concept, Maximo or other. No re-keying.

Separate M&E manuals

Separate mechanical and electrical manuals with a shared introduction, when your client wants them.

How to run it, not just what it is

Design schedules and basis of design, operating procedures in the maker's own words, legal duties at a glance and emergency first actions for the plant installed.

Maintenance that's real

Planned maintenance from the manufacturers' literature, with the page it came from, plus statutory checks. Warranties with expiry dates, spares and as-built drawings.

Nothing made up

Certificates and test results only ever come from the company that did the work. Anything missing is listed with who owes it.

Golden thread export

On higher-risk buildings, everything in open formats (PDF, CSV and folders) for your client's own golden thread system.

Ask This Building

Answers from the manual on any phone, each with the page it came from. Free for the building owner for 12 months after handover.

Clickable drawings

Every item on the as-built drawings that matches the asset register can be tapped, online and in the phone app, to open its details, maintenance and manual pages.

Plant QR stickers, printed

A hard-wearing polyester QR sticker for every item in the asset register, with its schedule reference, printed and posted free. Ask for them from your project page whenever suits, so your site team can fit them with the plant labels before handover. Scan one on site to open that item: its drawing, its O&M pages and Log a visit for the maintenance engineer.

Add-ons, from the same data.

Produced from the same checked documents as the manual. Where the documents don't say, the field is left blank, never guessed.

COBie workbook£300

COBie (Construction Operations Building information exchange) for your client's asset information model.

Building log book£250

In the style of CIBSE (Chartered Institution of Building Services Engineers) TM31, for Part L regulation 40.

Health and safety file£350

The building services information for the file under CDM, the Construction (Design and Management) Regulations 2015.

Building user guideIncluded on BREEAM projects

A plain English guide for the people who use the building: heating, cooling, ventilation, water, lighting and who to call. For BREEAM (Building Research Establishment Environmental Assessment Method) Man 04, written from the project documents.

Fire safety informationIncluded on new builds, extensions and changes of use

The fire safety information the Building Regulations ask for (regulation 38), for the building's responsible person: fire safety services, dampers, fire stopping, alarm links, testing and certificates.

Extended warranty registration£95

We find the plant whose warranty must be registered with the manufacturer, work out each deadline and chase the installer for the registration confirmation, so extended warranties aren't lost. Includes a registration register with the manual.

Missing manufacturers' manualsIncluded

Still missing after two chases? We find the manufacturer's own copy for the installed model and ask the installer to confirm it's what they fitted, so the manual isn't held up.

CAFM import fileIncluded

The asset register mapped to your client's CAFM system, in every manual.

Essential manual at PCIncluded

What the building needs on day one, with the full manual within 4 weeks of practical completion.

Printed manual£93 a 300 page set

A tick box on your order, priced on the pages. A 300 page manual is about £93 a set, 1,000 pages about £320. Colour, double sided, wire bound with a clear front and tabbed dividers, in volumes of up to 300 pages. Until all the documents are in it's an estimate, and we confirm it on the final page count. Drawings go in as QR codes that open the latest revision, kept working for at least 10 years from handover. A3 drawing sets quoted on request. USB copy £45.

Ask This Building

Answers on site, from the manual.

After handover the building's team just ask, and get the answer with the exact page it came from. Maintenance reminders arrive every month, and the first 12 months are free for the building owner.

Aftercare after handover

Nothing for you to pay or manage. At handover whoever runs the building gets aftercare free for 12 months, the usual defects period. After that they can carry on directly with us for £50 a month, or £400 a year (a year for the price of 8 months).

Run it for up to 3 years to cover a Soft Landings aftercare period. Export everything, free, at any time.

Aftercare£50 a monthOne option, everything in: the online manual, searchable, with a read only link for the maintenance team; Ask This Building; monthly maintenance reminders, statutory checks and warranty expiries, with a seasonal commissioning tracker at 3, 6, 9 and 12 months; and living manual updates, up to 4 times a year.
Paid yearly£400 a yearA year for the price of 8 months, per building.
First 12 monthsFreeFrom handover, for whoever runs the building.

From £495. Every company chased.

One fixed price by number of companies. Fixed, published prices, below what UK contractors typically pay an O&M bureau, with every subcontractor chased.

Up to 5 companies£495

Trade packages and small jobs.

6 to 10 companies£895

Small M&E jobs and refurbishments.

11 to 15 companies£1,295

A typical M&E fit-out.

16 to 20 companies£1,695

Larger fit-outs and new builds.

21 to 25 companies£2,095

Our largest published price.

Over 25 companies or 250 documentsProject quote

Also phased or multi building handovers and higher-risk buildings. Usually within 2 working days.

Small job, £250. Up to 5 companies and happy to collect the documents yourself? Upload everything through one link and we check every document and compile the manual to your company's standard format and file naming, the same on every small job. No chasing. Aftercare is the same 12 months free for whoever runs the building.

Work out your price

Your price£1,295

11 to 15 companies. Every company chased, every document checked twice and the manual signed off by an engineer.

Excludes VAT. Includes chasing, the PC pack, the CAFM import file and one manual. 15% off when you instruct us 8 weeks or more before practical completion. Your price locks when we confirm the document register.

Start a manual

Typical examples

Typical prices by number of companies, every company chased
ExampleEvery company chased
Trade package5 companies£495
Small M&E job6 companies£895
M&E fit-out14 companies£1,295
Larger M&E fit-out17 companies£1,695
Over 25 companies or 250 documentsProject quote, usually within 2 working days. Still well below a bureau plus your PM's time.

A recent 14 company M&E fit-out cost the contractor 4 PM days plus a £1,310 bureau fee, about £2,710. With OnTrack: £1,295, every company chased.

£2,710 PM days and a bureau£1,295 OnTrack, every company chased

All prices exclude VAT. Chasing is always included: upload what you already have and we only chase what's still missing, so a company whose documents you've uploaded in full is never emailed. Your price locks when we confirm the document register, within 2 working days of your upload. If the register or a company added later moves the job into a bigger band, we tell you first and you agree the new price in your client area; the difference goes on your invoice. Phased or multi building handovers and higher-risk buildings are a project quote too. 15% off when you instruct us 8 weeks or more before practical completion; rush service (under 3 weeks) is 25% extra. No deposit: we start when we have your PO, and you get one invoice with the final manual, payable in 30 days. You see a watermarked draft first. At handover whoever runs the building gets aftercare free for 12 months, then can carry on directly with us for £50 a month or £400 a year per building. BESA offer and Beat Your Quote terms are on our offers page. Add-ons: building log book £250, health and safety file £350, COBie data £300, extended warranty registration £95. Small job (up to 5 companies, you upload everything, no chasing): £250. Printed manual priced on its pages.

Your PM stays in control

When a company's nearly there, you decide.

Every company's progress is live in your client area, with a report every Friday. When the last few documents won't come, your PM gets a decision card showing exactly what's missing and why.

Accept it as sufficient, or keep us chasing. It's your call, and the manual records it.

Questions

What's included in the price?

Everything for one manual: we chase every company that still owes documents, check every document with two AI checkers, tell you each Friday exactly what's missing, and build and sign off the manual. One fixed price by the number of companies supplying documents: up to 5 companies £495, 6 to 10 £895, 11 to 15 £1,295, 16 to 20 £1,695, 21 to 25 £2,095. No per company fees and no extra for chasing.

I already have half the documents. Do I pay less?

The price is the same, and that keeps it simple. Upload what you have and we only chase what's still missing; a company whose documents you've already uploaded in full is never emailed. You never have to decide who needs chasing, and there's nothing to upgrade later if a company goes quiet.

When is my price fixed?

Your price locks when we confirm the document register, within 2 working days of your upload. If the register, or a company added later, moves the job into a bigger band, we tell you first and you agree the new price with one click in your client area. The difference goes on your one invoice, never a separate one.

How do we pay?

No deposit. We start as soon as we have your purchase order, and send one invoice with the final manual, payable in 30 days. Anything agreed later, such as a bigger band or an add-on, goes on that same invoice, so your accounts team never gets a small extra one.

What about large projects?

Over 25 companies or 250 documents, a phased or multi building handover, or a higher-risk building under the Building Safety Act: we send a project quote, usually within 2 working days. Still well below a bureau plus your PM's time.

Do you contact our subcontractors directly?

Yes, any company that still owes documents, with your written authority and an introduction from your project manager. We never instruct or agree anything on your behalf. A company whose documents you've already uploaded in full isn't contacted.

What if a company won't respond, or won't send the last few documents?

Your PM is copied into our emails as standard, so they always see where things are. If a company still hasn't sent everything after the second reminder, your PM gets a decision card showing exactly what's missing: accept what's there as good enough, or keep us chasing. It's always your call, and the manual records it. Anything still missing is listed in the manual with who owes it.

When should we instruct you?

At start on site, ideally. Chasing early means a complete manual at practical completion, and you get 15% off for 8 or more weeks' notice.

Can we have printed copies?

Yes. Tick it on your order, or add it any time later. It's priced on the pages, so you only pay for the manual you actually get: a 300 page manual is about £93 a set. Colour, wire bound with tabbed dividers, and drawings go in as QR codes that open the latest revision. We confirm the price on the final page count, and it only goes up if you agree.

What happens after handover?

At handover we email whoever runs the building (tell us on the form, or pass on the link we give you). They get aftercare free for 12 months: the building page, Ask This Building, monthly maintenance reminders and living manual updates. After that they can carry on directly with us for £50 a month or £400 a year per building; nothing is billed to you. Every Ask This Building answer shows the manual page it came from, so check it there before acting on it, and it isn't for emergencies. Open a sample building.

What happens to our data?

It's never used to train AI: we only use AI providers whose business terms don't allow it. You can export everything at any time. If aftercare stops you have 30 days to export it free, and we delete it after 90 days. On higher-risk buildings you keep your own golden thread copy; we give you an export in open formats.

Do you have any offers on?

Yes. Our BESA offer is 40% off your first manual, and if you already have a written quote from an O&M bureau, we'll beat it by 20%. Both end on 31st of January 2027. See the offer terms.

Start your next manual today.

Send your subcontractor and supplier list and we'll send your required information list within 1 working day.

One minute: how OnTrack chases, checks and delivers your O&M manual.